Dairy Facilities Engineering
Capital Cost
Estimation Worksheet

Introduction Basic Building Components Freestall Resting Area Ventilation System Heat Sress Mitigation Feed and Water Systems
Manure Removal Miscellaneous User Defined Summary Report
 
 

Enter the values requested below. If you are not sure of a certain value, use the suggested range as a guideline. Be as specific as possible. This will help improve results specific to your project.



MANURE Removal

Item
Price
Guideline
Cost per
Unit ($)
Est.
No. Units
Item Cost ($)
6A.
Alley Scraper
14 - $20K ea.
ea.
6B. Horizontal Auger $125/ft.
ft.
6C. Manure Pump $2,500 - 12, 500 ea.
ea.
6D. Gravity Flow Pipe $90/ft.

.

ft.
Subtotal:


Return to Fee and Water SystemsGo to MiscellaneousGo to the Report Page