Dairy Facilities Engineering
Capital Cost
Estimation Worksheet

Introduction Basic Building Components Freestall Resting Area Ventilation System Heat Sress Mitigation Feed and Water Systems
Manure Removal Miscellaneous User Defined Summary Report
 
 

Enter the values requested below. If you are not sure of a certain value, use the suggested range as a guideline. Be as specific as possible. This will help improve results specific to your project.



USER DEFINED ITEMS

Item
Cost per
Unit ($)
Est.
No. Units
Item
Cost ($)
8A.
8B.
8C.
8D.
8E.

8F.
8G.
 
Subtotal:

Return to MiscellaneousGo to the Summary PageGo to the Report Page

Animal Science Dept | PRO-DAIRY Program | Biological & Environmental Engineering Dept
Manure Management Program